STEADY EDDIE
SE-3D-200 · LOADING 3D STAGE
Three.js could not be loaded.

This model loads Three.js r128 from a local vendor/ folder (vendor/three.min.js, sibling or parent). No network copy is ever fetched. Keep the vendor folder next to this file. If every 3D tab shows nothing, the browser WebGL context cap is the usual cause — close other 3D tabs and check hardware acceleration.
PRIVATE PREVIEW — RESERVATION ACCESS ONLY
LOADER FAMILY — 3D DEPLOYMENT & SIMULATION
SE-3D-200 · R1.0
SIMULATION — schematic geometry, illustrative colour. No built hardware is depicted or implied.

SE-3D-200 · LOADER FAMILY

THE NUMBERS — WHAT IS REAL, WHAT IS SCHEMATIC

This panel separates what this simulation genuinely demonstrates from what it merely sketches. Where a figure exists, it is stated. Where a figure is not published, this panel says so — it does not invent one.

Live state

CONTROL AUTHORITY NOWHUMAN-ONLY  (reads the running film — schematic status, illustrative only)
MODE LADDERSE-0 INSTRUMENT (every deployment starts here) → SE-1 REMOTE (reachable in this film only through the human AUTHORIZE gate) → SE-2 · SE-3 · SE-4 · SE-5 — LOCKED. Each requires validation plus a fresh, named human authorization. Downgrade is instant at every rung and needs no gate.

Real in this file — executable, not narrated

ItemWhat is actually true here
THE AUTHORIZE GATEThe timeline genuinely halts at the gate. No cue, timer or script passes it — only the AUTHORIZE button. Pressing PLAY instead declines, and the film continues at SE-0 with nothing commanded. This is doctrine made executable.
INSTANT REVOKEREVOKE drops SE-1 authority the same frame it is pressed. There is no confirmation step on the way down, by design.
DEPLOYMENT GRAMMARInstall once (dock) · deploy when required (Eddie) · remove when not (dock stays). The sequence in THE FILM is the product's actual lifecycle claim.
PHYSICAL ACTUATION ONLYEddie's actuators seat on the stock steering wheel, loader joystick and pedals. No CAN, no ECU, no firmware integration — ever. Human controls always remain in place.
SCALE CONVENTION1 world unit = 1 metre. The crew figure is 1.8 m and is the only certified scale reference in the scene.
SE-1 SEGMENT LENGTHThe teleoperation work segment in this film runs 16 simulated seconds and repeats a generic load-and-carry cycle. It is a film beat, not a measured cycle time.
RELEASE SETThis is 1 of 9 SE-3D deployment simulations in the R1.0 set (SE-3D-100 … SE-3D-900), one per machine family. All nine share the same six views and the same doctrine. This file: SE-3D-200 R1.0, 2026-08-16.

Schematic in this file — drawn, not engineered

ItemStatus
MACHINE GEOMETRYClass-typical articulated wheel loader proportions. Boxy on purpose. No dimension is taken from any OEM model and none is a certified engineering dimension.
WORK SITEStockpiles, hardstand, haul road, hopper and truck are generic material-handling furniture at plausible scale. Distances are compressed for the camera.
SAFETY FIELDSThe stop field and warning field drawn in EYE IN THE SKY are illustrative envelopes. Field radii shown are not published safety distances and must not be read as such.
TELEMETRYLINK / ENVELOPE / E-STOP status text is schematic status, illustrative only.

Not published — stated rather than invented

PERFORMANCE FIGURESNo payload, cycle-time, availability, utilisation or productivity figure for the Loader family is published in this preview.
HARDWARE FIGURESEddie unit mass, actuator forces, grip limits, latch mechanism, power arrangement and dock fastener specification are not published.
SAFETY DISTANCESCertified stop-field and warning-field radii are not published; the zones drawn here are illustrative.
PRICE & AVAILABILITYNot published. This is a private preview under reservation access.
DOCUMENT PACK COUNTThe engineering document pack count for the Loader family is not published in this preview.

Reading the colour — the palette is the argument

ColourMeaning
CONSTRUCTION YELLOWThe host OEM machine — "yellow iron", untouched. Generic North-American construction yellow; no manufacturer's livery is reproduced or implied.
STEADY EDDIE REDOnly what Steady Eddie adds: the dock, the Eddie unit, the actuators, the transit route, the stop field. If it is red, it is the retrofit; if it is yellow, it was already there.
BRIGHT STEELWorking wear surfaces — lift arms, cylinders, bucket lip and teeth.
AMBERThe warning field and site furniture (cones, hi-vis, beacon) — attention, not prohibition.
EARTH TONESThe site: soil, subgrade, aggregate, concrete, verge grass — zone-coloured so the work area reads at a glance.

The six views — identical across all nine SE-3D files

View (key)What it is for
THE FILM (1)The deployment narrative: machine → dock → Eddie → engage → SE-0 → the human gate → SE-1 → removal. The gate genuinely blocks.
THE MACHINE (2)Close orbit on the loader and the SE hardware. Free exploration; click parts for their honest one-liners.
WORK AREA (3)The site at working distance, with the duty loop drawn on the ground: dig → carry → load truck / charge hopper.
EYE IN THE SKY (4)The site supervisor's overwatch: geofence, stop and warning fields, machine heading, crew exclusion, true 50 m scale bar.
THE PROGRAM (5)The pull-back: three loaders, one Eddie, one envelope, the mode ladder standing in the scene with SE-2…SE-5 locked.
THE NUMBERS (6)This panel — what is real, what is schematic, what is not published.

CONTROLS — DRAG orbit · WHEEL/PINCH zoom · RIGHT-DRAG pan · SPACE play/pause · ARROWS step · KEYS 1–6 switch view · CLICK objects for details. Free orbit works in every view.

NO DIMENSION SHOWN ANYWHERE IN THIS SIMULATION IS A CERTIFIED ENGINEERING DIMENSION. SCHEMATIC GEOMETRY AND ILLUSTRATIVE COLOUR THROUGHOUT — NO BUILT HARDWARE IS DEPICTED OR IMPLIED. PATENT PENDING. NOT AFFILIATED WITH OR ENDORSED BY ANY OEM.

AI PLANS. RULES GOVERN. HUMANS AUTHORIZE. SAFETY HAS VETO.
Human decision required. Press PLAY instead to decline and hold at SE-0.
STEADY EDDIE · PHYSICAL AUTONOMY SYSTEMS

LOADER FAMILY

SE-3D-200 · 3D DEPLOYMENT & SIMULATION · R1.0

A class-accurate schematic wheel loader, then the full Steady Eddie deployment sequence. Dock installs once and stays. Eddie deploys when required and is removed when not. The mode ladder climbs only through a human authorization gate; downgrade is instant.

SIMULATION — schematic geometry. No built hardware is depicted or implied.
DRAG — ORBIT · WHEEL / PINCH — ZOOM · RIGHT-DRAG — PAN
SPACE — PLAY/PAUSE · ARROW KEYS — STEP THE SEQUENCE · KEYS 1–6 — SWITCH VIEW
VIEWS: THE FILM · THE MACHINE · WORK AREA · EYE IN THE SKY · THE PROGRAM · THE NUMBERS
SEQUENCE COMPLETE

DOCK STAYS. EDDIE MOVES.

The machine is back to human-only — same controls, same machine. The dock waits, empty, for the next deployment. Higher modes SE-2…SE-5 stay locked: each requires validation and a fresh human authorization.

AI plans. Rules govern. Humans authorize. Safety has veto.